Deploy IonicWallz in Your Environment
Step-by-step guides for deploying IonicWallz in cloud, on-premise, or hybrid environments.
Choose Your Deployment
Select the option that best fits your requirements
Cloud Deployment
Fully managed SaaS deployment with automatic updates and scaling.
- No infrastructure to manage
- Automatic updates and patches
- Built-in redundancy and backups
- SOC 2 Type II certified infrastructure
On-Premise Deployment
Self-hosted deployment for maximum control and data residency.
- Full control over your data
- Air-gapped network support
- Custom retention policies
- Integration with existing infrastructure
Hybrid Deployment
Combine cloud management with on-premise data storage.
- Cloud console for management
- Data stored on your infrastructure
- Flexible data residency options
- Best of both worlds
Quick Start Guide
Get up and running in under an hour
Download Agent Package
Get the agent installer from your IonicWallz dashboard.
2 minutesConfigure Deployment Policy
Set up monitoring policies and user groups in the console.
15 minutesDeploy to Endpoints
Use your MDM/deployment tool or manual installation.
30 minutesVerify Connectivity
Confirm agents are reporting to the console.
5 minutesConfigure Alerts
Set up notifications for security events.
10 minutesSystem Requirements
Ensure your environment meets these prerequisites
Agent Requirements
Server Requirements (On-Premise)
Deployment FAQs
Common questions about deploying IonicWallz
Can I deploy agents silently?
Yes, all agent installers support silent/unattended installation. We provide MSI packages for Windows, PKG for macOS, and shell scripts for Linux with command-line options.
What MDM tools are supported?
IonicWallz integrates with popular MDM solutions including Microsoft Intune, Jamf, VMware Workspace ONE, and others. We provide pre-configured deployment packages for each.
How do I handle updates?
Cloud deployments receive automatic updates. On-premise deployments can be configured for automatic updates or manual approval depending on your change management requirements.
Is there a staging environment?
Yes, we recommend deploying to a pilot group first. You can create separate policies for staging and gradually roll out to production.